Playground Development

Gosford Park Primary School

Gosford Park Primary School came to us to help with the project of redesigning their playgrounds and creating a new science garden within the school that could embrace the new curriculum.

The children were keen to have something to play on in both playgrounds as they had no equipment, it was decided that Log climbers with the appropriate surfacing underneath would be perfect.

The Head Teacher was also keen on having a MUGA (Multi Use Games Area) on the school field so that all weather play was possible. She also felt a science garden was important to make sure the curriculum was being taught to full capacity. The works took place over three weeks during the summer holidays. We managed the entire project ensuring it had minimal impact for the school who were running summer clubs throughout the holiday.
Staff at Gosford Park Primary School couldn’t be happier and are looking forward to being able to further embrace the curriculum with these fantastic new additions.
SJ Solutions have helped us enormously with two big projects which took place in the Summer holidays 2015. From the initial quotes though to managing the workforce, Sam Morris ensured everything ran smoothly and that the workmanship was of a good quality. She managed the project which included the installation of a MUGA (multi use games area) with all weather flooring, two climbing areas and the development of a science outdoor learning area which included the installation of log cabin. Her company were so efficient and took the hard work of managing a project of this size and nature. We can’t thank Sam enough for all her hard work.
LEAH BADDELEY
Headteacher